A 4,500 square foot home in Chino Hills with four bedrooms, four baths, a theater, an office and two kitchens. The hard part was the hillside site.
Key points
- About 150 truckloads of soil were hauled away.
- The grade difference with the neighbor is about ten feet, handled by a stepped, two level retaining wall.
- Footings are about two feet by two feet, and major grading came before the house itself.
Questions
What makes hillside construction harder?
Before the house goes up you need excavation, soil export, retaining walls and grading, which adds time and cost.